Workflow Pending Pooled Task Long Loading time
PostPosted:Mon Jan 04, 2021 4:56 am
We have around 1000 documents coming into the system every day. To process these documents we are using a workflow. Because of this, the pooled task will contain more than 500 documents. It takes more than 5m to load the pooled task every time. Is there a way to reduce the time of loading without affecting the flow?